Keep your new landscaping looking its best. Find the instructions for newly installed sod, trees and shrubs, and interlocking pavers below.
Watering & care for newly installed sod
Once your sod is laid, it will be fertilized and rolled with a sod roller to give it good contact with the top soil.
Immediately after we have laid your sod it is important that you water your entire sod area immediately (either tonight or first thing tomorrow morning), paying particular attention to the corners and edges so they have a thorough watering. We did give it a light watering. Wind and sun can severely dry out the sod and plants, so you’ll want to pay attention to that.
Simply put:
- Everyday (starting today), water deep (so moisture can be seen under sod when lifting an edge of the sod and on the top soil in all areas of the yard), water often (daily or twice daily in extreme heat), water everywhere (trying to ensure adequate watering along the edges and in the corners or your new sod and at sides of house).
- For the first 7 – 8 days water every day (water in the very early morning or later evening) – especially in hot, dry weather, to get an established lawn. Even if it rains, make sure areas which have not received lots of rain are thoroughly watered. Try to avoid walking on the sod much for the first week or week and a half (little children shouldn’t affect it much if they run on it a few times in the meantime).
- Be sure to avoid any foot traffic right after watering or rain.
- Also, be careful not to water-log some areas and under water other areas. Try to keep your watering even. If you will be away, ask someone you trust to water thoroughly once a day for you, unless there is adequate rain.
- Once you see the sod roots fully anchor to the top soil, you can start reducing the number of times you are watering per week slightly and eventually follow your regular watering routine. Mowing can probably start within 10 days or 2 weeks, depending on the length.
- You will likely see areas or patches that look dry or like they are drying out. However, if you are following these instructions carefully every day, you will notice new growth / grass growing up through any drying patches and you will also start seeing roots start to root to the soil in a week or two. These areas will green up with time.
- One last thing to note. If you have a newer home (up to 3 or 4 years old or so), you may see some settling, sinkage or dips develop where you have had new sod laid or you are watering. This is because of the backfilling, sub grade and final grade done by the builder and cannot be controlled by us. At some point in the future, you can level it off with some thin layers of top soil (you can buy bags at Canadian Tire, Home Depot etc.) to get back to normal grade.
Care for newly planted shrubs and trees
- Water deeply right after planting, if they have not been thoroughly watered already.
- Water every 2–3 days for the first two weeks.
- After that, water once per week, more often during hot, dry weather.
- Keep soil consistently moist but not waterlogged.
- You can also choose to apply 2–3 inches of mulch to retain moisture and regulate soil temperature.
- Keep mulch a few inches away from trunks and stems.
- Avoid fertilizing during the first year.
- Ensure the plant is in the correct sun exposure for its species.
- Protect young plants from strong Alberta winds if the site is exposed.
- Stake newly planted trees only if unstable; if the tree is established, you can remove stakes after one year.
- You can also add extra mulch in late fall for winter insulation and wrap young tree trunks in winter to prevent sunscald.
- Use guards or fencing to protect from rabbits, voles, and deer, if these are a problem on your property.
- Check soil moisture regularly and watch for signs of stress.
Care for interlocking pavers and stonework
Rinse with a garden hose as needed; avoid high‑pressure washing or pressure washers.
Reapply polymeric sand by hand to joints if gaps appear after the first few weeks.
Maintain proper drainage by keeping edges and surrounding areas clear of soil buildup.
If you choose to seal pavers, do so only after they have fully cured (typically 60–90 days); sealing can help with stain resistance and colour enhancement.
In Alberta winters, use plastic shovels instead of metal to avoid scratching.
Avoid salt-based de‑icers; use sand or calcium magnesium acetate instead.
Re-level individual stones as needed, if shifting occures.
Top up joint sand each spring to maintain stability and prevent weed growth.

